The cost of (heavily) refurbishing a flat in Brighton in 2020

A rough order of magnitude

Build was converting an open plan shop into residential (two bedroom flat). Add 10% waste for all skirting, flooring and tiles. Estimate the cost of the electics as you go along if they’re not defined by the architect or you’re diverging from what the building contractor has specified. Anything to do with getting a new supply of electrics or water costs at least a grand. Patching the roof up was an unexpected expense. [Read More]